M1Can
Mechanical
- Feb 8, 2005
- 26
I was doing some test cases with other structural programs, basically ran a pipe arrangement with 3 programs ( one of which is CII). The results of the two of the programs were very close 2-3% but the ceasar results were off by as much as 100% . Any ideas what may cause this , I have always just assumed CII was correct but now I have doubts
M1 Engineering
M1 Engineering