Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Version vs. Revision - Teamcenter

Status
Not open for further replies.

iilter

Mechanical
Joined
Apr 19, 2021
Messages
1
Location
TR
I am trying to implement a PDM-PLM (teamcenter) and a coding/numbering system within it.

We want to manage parts and drawings (documents) in this common way,
123456.001 = part (v1)
123456.002 = part (v2, not interchangeable with v1)
123456.000 = used to address all versions of part 123456
123456 = document (drawing) number

Inside drawing (title block) there will be a field for doc. revision traceability (RevA, RevB...). This revision letter will increase only in interchangeable changes (means only in document changes or minor changes in part dimensions). Sometimes you realise something wrong on drawing and you will take care of the minor mistake (tolerancing, typo, alignment, etc) only on drawing and publish it again (with rev. letter increment)

But as far as I can understand, there is no such system or working method in Teamcenter. Am I right? Is there any way to manage it in Teamcenter? To make Teamcenter increase revision letter but not change version number when needed?
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top