struct4me
Civil/Environmental
- Feb 4, 2013
- 32
WE are planning to do a deep drilling by down-to-bottom (symmetrix) method from ground to almost 150 m below ground in mostly rock to grout the shaft area in concentric way of drilling holes (120-200 mm diameter) and thereafter do the cement/chemical grouting. This is to be done to arrest the water leaking from the vertical surge shaft for a hydro power station.
Can any one help me in estimating the price rate (i.e. price per m of drilling) analysis for the drilling works with multi stage option using packers.
Your help will be much appreciated.
Thanks & Regards
Can any one help me in estimating the price rate (i.e. price per m of drilling) analysis for the drilling works with multi stage option using packers.
Your help will be much appreciated.
Thanks & Regards