macabihaifa
Chemical
- Nov 28, 2003
- 10
Hello,
A long (50 km) petroleum underground pipe is designed to have a flow metering station every 2 km.
How can I draw a P&ID to show one typical metering station which will be repeated 25 times ?
A simple sketch will be helpful.
regards
A long (50 km) petroleum underground pipe is designed to have a flow metering station every 2 km.
How can I draw a P&ID to show one typical metering station which will be repeated 25 times ?
A simple sketch will be helpful.
regards