Eng9876
Civil/Environmental
- Nov 30, 2004
- 15
Looking at earth retaining next to some process equipment with several pipe tie-ins. The solution would involve driving piles with a Vibro hammer right next to the equipment. What things should I look out for and what would be acceptable limits for such a situation? Thank you in advance