I read through this old forum post but it did not quite answer my question. I was asked last week to find out what the standard is from NETA or IEEE or some other reliable source even a VLF equipment manufacturer referencing a paper that in some way says how often VLF testing should be conducted. So far I have come up empty handed. I was also asked about oil-filled transformers and figuring out a standard testing on those to which I did find many recommendations (even in here) about testing the oil annually or more frequently if a problem is suspected and going by either a 3 or 5 year shut down check.
Can anyone tell me and/or reference a link/paper to the frequency of VLF testing and what is supposed to be included in the scheduled shut down testing on the transformers?
Thanks and if I am not clear on something in here bare with me I will try to clarify if needed/if I find out more.
I read through this old forum post but it did not quite answer my question. I was asked last week to find out what the standard is from NETA or IEEE or some other reliable source even a VLF equipment manufacturer referencing a paper that in some way says how often VLF testing should be conducted. So far I have come up empty handed. I was also asked about oil-filled transformers and figuring out a standard testing on those to which I did find many recommendations (even in here) about testing the oil annually or more frequently if a problem is suspected and going by either a 3 or 5 year shut down check.
Can anyone tell me and/or reference a link/paper to the frequency of VLF testing and what is supposed to be included in the scheduled shut down testing on the transformers?
Thanks and if I am not clear on something in here bare with me I will try to clarify if needed/if I find out more.