Hello,
We are writing the technical specifications for contracting the replacement of secondary superheater panels and their connecting tubes to inlet and outlet headers in a 150 MW coal fired power plant.
Nozzle to header connections are similar to illustration z-1 in Figure PW-16.1. Header is SA-335-P11 12-3/4" OD x 2.143" MWT, and tubes are SA-213-T22 2" OD x 0.240" MWT.
Does these welds require RT or UT examination? or Volumetric examination of attachment welds may be omitted for this type of welds according to PW-16.3?
Thanks for your time, and any advice will be appreciated.
Javier Guevara E.
Projects, Mechanical Engineer
We are writing the technical specifications for contracting the replacement of secondary superheater panels and their connecting tubes to inlet and outlet headers in a 150 MW coal fired power plant.
Nozzle to header connections are similar to illustration z-1 in Figure PW-16.1. Header is SA-335-P11 12-3/4" OD x 2.143" MWT, and tubes are SA-213-T22 2" OD x 0.240" MWT.
Does these welds require RT or UT examination? or Volumetric examination of attachment welds may be omitted for this type of welds according to PW-16.3?
Thanks for your time, and any advice will be appreciated.
Javier Guevara E.
Projects, Mechanical Engineer