Chemtech2
Chemical
- Feb 9, 2004
- 7
The existing VRU in a petroleum loading terminal has its absorber vapor outlet line traced. I was not sure of its requirement ( the unit is in Canada, maybe for winterization). the line currently has a steam tracing (1/2" copper tubinh using 150 psig steam) which I have to replace by Electric tracing. I also need help to do the conversion.
Thx.
Thx.