sigma1
Structural
- Jun 26, 2003
- 105
The concrete contractor failed to provide a key prior to concrete pouring. They are now proposing the use of an adhesive between the footing surface and the wall above. The structure is located in a seismic area.
Any comments or recommendations would help.
Any comments or recommendations would help.