cimmeron
Civil/Environmental
- Dec 16, 2002
- 24
I am designing a project in North Florida with a detention basin that also includes water quality treatment.However, I would like more fill from the pond than the 12 feet allowed. This depth limit is imposed to prevent metal and other contaminates from being sucked up from the bottom. My question is: If I provide a separate water quality treatment system that satisfies the requirements, can I then dig the detention basin deeper? I would appreciate any comments on this questino.
Cimmeron
Cimmeron