Hi all fellow
I am currently working on a project about a hotel in rural area. The owner want to change the upper floor from living to dancing area. So the live load changed. The case is that steel truss support the timber joist, and is being supported by a primary I beam. In my previous analysis, the truss and I beam just meet the design required for living case. But my client want this project go, so add more truss to reduce the spacing is ok. But he don't want to switch the primary beam, also, he want open area under, so added one more column or support is impossible. So do anyone have any idea.
Thank you for you time
I am currently working on a project about a hotel in rural area. The owner want to change the upper floor from living to dancing area. So the live load changed. The case is that steel truss support the timber joist, and is being supported by a primary I beam. In my previous analysis, the truss and I beam just meet the design required for living case. But my client want this project go, so add more truss to reduce the spacing is ok. But he don't want to switch the primary beam, also, he want open area under, so added one more column or support is impossible. So do anyone have any idea.
Thank you for you time