instrumentdxb
Electrical
- Feb 27, 2005
- 1
Hi There,
I am working on a project where i need to install a weighing system in a power&free conveyor. in the original design the part in which load cell(s) mounted (the stucture including piece of conveyor where the load hangs) was mounted on the beam on top of the conveyor. A re-design was carried out and according to the new design the load cell "brdige" between weighing part of conveyor and non weighing part. which means one side of the load cell is fixed to the non weighing part and the other side of the load cell to the weighing part. we find the weight deviates from the standard weight after calibration. while calibration we find the display matches the actual weight but once production starts the weight deviates. any reason why this deviation occures.
Thanks
I am working on a project where i need to install a weighing system in a power&free conveyor. in the original design the part in which load cell(s) mounted (the stucture including piece of conveyor where the load hangs) was mounted on the beam on top of the conveyor. A re-design was carried out and according to the new design the load cell "brdige" between weighing part of conveyor and non weighing part. which means one side of the load cell is fixed to the non weighing part and the other side of the load cell to the weighing part. we find the weight deviates from the standard weight after calibration. while calibration we find the display matches the actual weight but once production starts the weight deviates. any reason why this deviation occures.
Thanks