A number of years back I worked with a domestic E&C getting A/SA 691 P91 pipe approved for use in Power Plant construction. After months of testing and qualification in Europe, the welded pipe was finally approved. I am trying to understand the current B31.1 and Section 1 requirements related to the use of welded construction in power (boiler) applications. Specifically, where can welded be utilized AND where does the code still mandate a seamless product.
thanks for the input on this topic.