Hi.
there's this problem found at welding shop, as mentioned in title, we have overlapping seam problem.
For further info. the material is SS316Ti, Wall thickness is 22.23mm the design condition of pipe is 3.5 BarG and 515'C
The longitudinal seam is heat treated by manufacturer.
Is it okay to drill out the hole across weld seam and attach a new olet for thermowell and apply 100% RT?
thank you