Berniedog
Structural
- Dec 19, 2005
- 200
We received a Structural Steel report. Can someone direct me to a reference that will show the following:
1. The weld was unacceptable due to overlap. Overlap
2. The weld was unacceptable due to being underfilled.
3. Excessive undercut.
Thanks
1. The weld was unacceptable due to overlap. Overlap
2. The weld was unacceptable due to being underfilled.
3. Excessive undercut.
Thanks