litstatic
Mechanical
- Aug 10, 2015
- 1
Regarding the subject, is there an alternative refractory lining support? Since the API RP 934-C requirements below are impractical if applied to refractory anchors.
We have a reactor in Hydrogen Service with the following info:
Equipment Name: PreReformer
Design Pressure: 50 bar
Design Temp: 235°C
(Operating Temp): 515°C
Refractory Lining thickness: 75 mm (castable)
Material: SA-387 Gr.11 Cl.2
MDMT: -19°C
Inside Diameter: 4150 mm
TL to TL: 3300 mm
My concerns are the following:
1. Welding of stainless steel refractory anchors to 1 1/4Cr-1/2Mo shell -- dissimilar metal weld.
2. Para. 7.1.2 a) of API RP 934-C requires that "All welded joints including non-pressure attachments to the vessel body should have full penetration joint design." -- impractical since refractory anchors are small and of wire material.
3. What NDE method to be used after welding of refractory anchors?
4. Para. 7.3.1 of API RP 934-C: All base metals should be heated to a minimum of 300 °F (150 °C) during all welding, rolling, thermal cutting, and gouging operations. -- w/c is also impractical since the entire internal surface of the reactor is refractory lined.
Thanks in advance.
We have a reactor in Hydrogen Service with the following info:
Equipment Name: PreReformer
Design Pressure: 50 bar
Design Temp: 235°C
(Operating Temp): 515°C
Refractory Lining thickness: 75 mm (castable)
Material: SA-387 Gr.11 Cl.2
MDMT: -19°C
Inside Diameter: 4150 mm
TL to TL: 3300 mm
My concerns are the following:
1. Welding of stainless steel refractory anchors to 1 1/4Cr-1/2Mo shell -- dissimilar metal weld.
2. Para. 7.1.2 a) of API RP 934-C requires that "All welded joints including non-pressure attachments to the vessel body should have full penetration joint design." -- impractical since refractory anchors are small and of wire material.
3. What NDE method to be used after welding of refractory anchors?
4. Para. 7.3.1 of API RP 934-C: All base metals should be heated to a minimum of 300 °F (150 °C) during all welding, rolling, thermal cutting, and gouging operations. -- w/c is also impractical since the entire internal surface of the reactor is refractory lined.
Thanks in advance.