civilbjp
Civil/Environmental
- Jan 6, 2003
- 18
I am an engineer in Wisconsin. I have recently undertaken the task of designing subdivisions and got overwhelmed with the stormwater management. Here is my dilemma: If I have an urban section of road, I can size the storm sewer based on watersheds to determine the size of pipe. Knowing that the storm sewer needs to drain to a detention pond, I then size the detention pond, but I have a hard time getting inverts to work. Looking back, I wonder if I should have designed the detention pond first but then I may have issues with the storm sewer. Maybe I am looking at this wrong, but I would like some advice as to the general steps one would take to develop a grading plan, design the storm sewer, and design appropriate detention facilities to maximize efficiency. In addition, is there any good web sites or literature to assist designers to select appropriate BMPs to meet the new Phase II construction requirements by DNR and EPA.