Stephen Max
Mechanical
- Jun 10, 2017
- 22
I am working on a pressure vessel for laboratory use that is designed per Division 1 rules. I have been doing extensive FEA on the design per Division 2 guidelines, but I am not clear what is required for ASME certification under Division 1 rules.
If the PV is based on Div 1 design by rule, what FEA documentation is required for the stamp?
If the PV is based on Div 1 design by rule, what FEA documentation is required for the stamp?