haynewp
Structural
- Dec 13, 2000
- 2,306
I have started a detail of a new retaining wall going beside a new metal building. I think the better detail would be to just let them pour the wall footing and the metal building column ftg at the same time, but I'm not sure. Then the retaining wall could use the column ftg as a toe. But, it may be easier to make 2 separate pours. Or do you think difference in settlement could be a problem? Or, I could have separate pours then use smooth dowels to connect the footings? This is usually where I make the wrong decision. Here they are: