atlas06
Mechanical
- Nov 22, 2006
- 244
Hello all,
We have a kitchen application using a steam boiler for kettles rated at 1800 LBS/HR. We were recommending two boilers sized at 2/3 each for continuous operation during maintenance and redundancy.
At what Boiler Plant capacity does one need to have a buidling engineer 24-hours per day in the boiler plant?
Thank you
We have a kitchen application using a steam boiler for kettles rated at 1800 LBS/HR. We were recommending two boilers sized at 2/3 each for continuous operation during maintenance and redundancy.
At what Boiler Plant capacity does one need to have a buidling engineer 24-hours per day in the boiler plant?
Thank you