Jo9008
Mechanical
- Sep 16, 2019
- 1
NFPA 20 says I cant use a PRV after my pump discharge to limit system pressure. Well where does that "discharge" end? Can I put it at the the base of a riser? Does the riser need a check valve? Or can it only go after floor control valves?