I have a scheme where we are installing new pile close to existing, it has been suggested to me I should be reducing the capacity of the existing. Why? If we are far enough away and block failure of the pile group is not critical why does it matter? Why is that any different to them being installed at the same time. The existing is actually less capacity than the new piles.?
I see no logic. Maybe if the old were greater capacity keep the load down to the new, I can almost understand the logic. but not this. Any ideas?
I see no logic. Maybe if the old were greater capacity keep the load down to the new, I can almost understand the logic. but not this. Any ideas?