jnlbctln
Structural
- May 11, 2013
- 3
1. Could someone kindly explain why steel should yield first before concrete fails?
2. Let's say on the tension side of a beam, how would the steel fails first before the concrete knowing that the steel is basically the one that support the tensile stress? Isn't it that the concrete would crack/crash first before the tension rebars yield?
2. Let's say on the tension side of a beam, how would the steel fails first before the concrete knowing that the steel is basically the one that support the tensile stress? Isn't it that the concrete would crack/crash first before the tension rebars yield?