Bogusbogedi
Structural
- May 31, 2024
- 16
I am currently working on the design of a concrete cantilever retaining wall (front facing the sea) that will hold about 3m of backfill material and a 3m concrete block wall just above it. There will be columns emerging from the retaining wall to tie the walls together at 3m span c/c.
What are your views on wind loading in this case?
If it is considered how is that load transferred to the retaining wall?
Are there options to minimise these transfers through joints and anchorage lengths of steel cause these forces over such lever arms generates bigger moments.
What are your views on wind loading in this case?
If it is considered how is that load transferred to the retaining wall?
Are there options to minimise these transfers through joints and anchorage lengths of steel cause these forces over such lever arms generates bigger moments.