Entherm
Civil/Environmental
- Sep 23, 2020
- 34
I tried connecting the end of a wire beam to a solid using an MPC beam constraint. The analysis runs fine in linear range but doesn't give expected results in a non-linear material regime. Can someone help me understand how I should connect those two?