Okiryu
Civil/Environmental
- Sep 13, 2013
- 1,094
I have a slab on grade, 6 and 8 inches thick. No vehicle loading, just well distributed load (liquid). Saw cut is 40 mm depth and wire mesh is 50 mm below the surface of the slab. Do I needs to cut the wire mesh under the saw cut joints or can the wire mesh be continuous thru the slab. Joints are at 5 m spacing.