Looking at sprinklers in a 100+ year old theatre renovation.
Why does everyone else get the simple, clean warehouse jobs and I stuck with stuff like this?
So the architect tells me they're going to install a suspended ceiling below the wood lath about to the line of molding you see 1'-0" or so beneath.
Photo here
The attic above the lath is kind of neat, a heavy timber 6 in 12 pitched roof protected using a dry pipe system. Question is area below the wood lathe... if the space is more then 6" then I feel it would require another level of sprinklers. I want to tell the owner to simply remove the lath or install the ceiling within 6" of the wood lath.
Do you agree?
Why does everyone else get the simple, clean warehouse jobs and I stuck with stuff like this?
So the architect tells me they're going to install a suspended ceiling below the wood lath about to the line of molding you see 1'-0" or so beneath.
Photo here
The attic above the lath is kind of neat, a heavy timber 6 in 12 pitched roof protected using a dry pipe system. Question is area below the wood lathe... if the space is more then 6" then I feel it would require another level of sprinklers. I want to tell the owner to simply remove the lath or install the ceiling within 6" of the wood lath.
Do you agree?