trevorpan
Structural
- Feb 5, 2017
- 4
Hi,
I have a simple residential project. Using IRC 2012 tables and recommendations.
Concerned the driveway slab will heave in rain storms. Do you think it better to have smooth dowels and bond break as shown (duct tape), or provide a key?
I've also thought of adding a bond break on top of the footing, so the slab can move. And removing the dowels altogether. Just have a turndown butt up against the stem wall, and garage opening turndown.
Thoughts?
Trevor
Trevor Pan-Architect, PLLC
I have a simple residential project. Using IRC 2012 tables and recommendations.
Concerned the driveway slab will heave in rain storms. Do you think it better to have smooth dowels and bond break as shown (duct tape), or provide a key?
I've also thought of adding a bond break on top of the footing, so the slab can move. And removing the dowels altogether. Just have a turndown butt up against the stem wall, and garage opening turndown.
Thoughts?
Trevor
Trevor Pan-Architect, PLLC