Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations IDS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Consultant Design Fees

Status
Not open for further replies.

cnorris

Civil/Environmental
Apr 24, 2000
4
I am looking to find references/publications regarding Consultant Design Fee percentages as a percent of construction costs.&nbsp;&nbsp;&nbsp;&nbsp;<br><br>I have access to Means, which lists some estimates, but was looking for some other references.<br><br>The particular type of construction I am interested in is Wastewater/Water plants and water/sewer line work.<br><br>I feel sure that either ASCE or WEF or even ENR has such data and publishes it, but am having problems finding it.<br><br>Any assistance would be appreciated.<br><A HREF="mailto:Cnorris@mwwssb.com">Cnorris@mwwssb.com</A>
 
Replies continue below

Recommended for you

Please remember that the design fee should reflect the amount of effort required to complete the design.&nbsp;&nbsp;Example, the design of sewer and water through a cornfield with no other special conditions to serve a new subdivision can be relatively low, maybe 3-5% of construction cost.&nbsp;&nbsp;However the design of a sewer through a crowded urbanized area with tough soils and many permitting issues will be relatively high, 8 - 12% of construction cost.&nbsp;&nbsp;Permitting issues can account for 50% of the &quot;design effort&quot; in a highly regulatory state like Wisc.&nbsp;&nbsp;A straight percentage doesn't account for the complexity of the design and permitting.
 
Check with the USDA Rural Development website. They have the Engineering Agreement with standard
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor