Tech1
Civil/Environmental
- Sep 7, 2001
- 2
Does anyone know the procedure or where to find it, the step by step instructions for designing runoff calcs and generating a report using TR-55. I have done these by hand but can't figure the program out. I have tried both the DOS and windows version. All the tables and screens have been set up, but it as far as I can manage.
Tech1
Tech1