martin888888
Civil/Environmental
What is the difference between the TR-55 SCS Method and the Santa Barbara method? I have a large highway project with sub-basins in the 5ac maximum range. What would be best to use for this project? Jurisdiction doesnt specify but they want a hydrograph method used instead of the Rational Method.