Hello,
Does anyone here have any experience with welding down in a 40 ft temporary pit? For a project, two pipes need to be welded together but this weld needs to take place 40 ft below grade. We are planning to construct some sort of temporary steel caisson with pumps running continuously to keep the water out.
I am in the process of researching what our options are, not working on a design or spec yet.
Does anyone have some experience with this or can point me in the right direction to see how this is commonly done?
Thank you
Does anyone here have any experience with welding down in a 40 ft temporary pit? For a project, two pipes need to be welded together but this weld needs to take place 40 ft below grade. We are planning to construct some sort of temporary steel caisson with pumps running continuously to keep the water out.
I am in the process of researching what our options are, not working on a design or spec yet.
Does anyone have some experience with this or can point me in the right direction to see how this is commonly done?
Thank you