How do you specify the set pressures and back pressures for a number of thermal relief valves in a cascading relief system where a long process line is blocked in many sections? What is the best type of TRV to be used? Balanced bellow or pilot-operated? What is the benefit to use pilot-operated TRVs? Do you have to specify spring setting (differential set pressure)? Is there any reason to drain the last section of line near the storage tank? I have read a document which recommends to drain the last section and set the TRV set pressure at 110% of its MAWP in order to take the advantage of 133% max. pressure allowed for piping.