What is requirement for secondary egress
Right now have a platform 16’ high above grade
Has two small vessels on top and
Is 12’x24’ with access around vessels all 4 sides.
Bolting to the flange also makes since to me.
Just that I am seeing the new generation of engineers bolting to the stem which causes them to have to strip flange at the gusset plate.
Even AISC only gives a bolt gage for the flange not the stem.
I was wondering which way people orientate the WT bracing.
With stem of WT vertical or horizontal?
https://files.engineering.com/getfile.aspx?folder=eaa9c835-472b-42cb-947d-9e57b779f403&file=Capture.JPG...
I agree with you.
The field added a temporary skid and set it on fiberglass grating.
There is an engineer here giving an ok to add two air compressor on top of that skid.
I have see where operating companies specifically state not to place equipment on top of grating.
I was hoping to find a spec...