I m not an expert in the field of executing and designing road
but I m working on an electrical substation project
Where I should submit the design of the access road
And I have this small issue
The area next to the site is super flat so i need to backfill couple of layer of subgrade and...
Hello
I m building a road in a flat area so I need to rise the road one meter above natural ground level
Any idea what should be the slope of my fill for one meter height ?
If you can send me a reference it would be perfect
I totally agree
But the consultant required 28 days
This will delay my progress on site for 2 weeks
And with no article ,code or reference I wont be able to convince him
Hello
I am driving piles for a building
And I want to start casting pile caps but the consultant didn't allow to cast any concrete structure while driving
Do you have any reference concerning this issue ?
THANK YOU FOR YOUR REPLY AND SORRY FOR THE DELAY
THAT'S A SKETCH OF THE STRUCTURE (ATTACHMENT)
ITS A BUILDING RETAINING WALL
SO I DON'T THINK I HAVE AN OVERTURNING PROBLEM
EXISTING WALL THICKNESS 30 CM THE NEW ONE I SHOULD ADD 30 CM SO 60 CM
WHAT I ' M ASKING IS THE CONNECTION BETWEEN THE...
I need to increase the height of an existing retaining wall from 5 to 9 m .
The overall stability of the structure is checked.
BUT i need to increase its thickness .
Should i use bars anchored bars with epoxy to make sure that the two structures are working as one
In intermediate moment frames should i use for bars development the eqt of 21.7.5 or the eqt of 12.2.3
What i m sure of is that 21.7.5 eqt is used for special moment frame but should we use it for intermediate too ?