Do you have any documents that could assist in guiding us for the Dismantling and Erection part ? just for reference. If yes, can you inbox us the same ? it will help.
Hello Stephen,
thanks for reverting. more details as follows.
1. reducing tank height (from15mtrs to 12mtrs) and roof conversion(EFRVT to CRVT), both jobs to be executed on same tank.
2. 2 wind girder available which have to be replaced with a single wind girder at location specified by the...
Hello Everyone,
We require tank conversion methodology, so that same can be vetted and approved.
job 1 : reducing tank height from 15 mtrs to 12mtrs
job 2 : converting roof from external floating roof to cone roof.