  1. tcihvacff1

    VENTILATION SYSTEM FOR FOOD PROCESSING UNIT

    Dear berkshire, I think you are correct. I will try to provide a shaft with damper as u said. Thanks for ur suggestion
  2. tcihvacff1

    Need suggestions for new design engineer

    Join TCI (TECHNICAL CAREER INSTITUTE) for advance & professional MEP designing & drafting training. And get ready to enter into the building industry. contact: +919148467173
  3. tcihvacff1

    VENTILATION SYSTEM FOR FOOD PROCESSING UNIT

    Dear All, I highly appreciate your valuable comments on the subject & thanks for ur involvement. From your different answers I Finally came to a proposal that: 1.Firstly I will construct a partition between the Oven area & the working area. 2.Secondly, for the extraction of hot fumes coming out...
  4. tcihvacff1

    VENTILATION SYSTEM FOR FOOD PROCESSING UNIT

    Thanks a lot @ dbill74
  5. tcihvacff1

    VENTILATION SYSTEM FOR FOOD PROCESSING UNIT

    And if I change the position of Ovens , what is the ideal height to be maintain between the top of the oven & the hood? Pls share your experience. Awaiting for your valuable comments.
  6. tcihvacff1

    VENTILATION SYSTEM FOR FOOD PROCESSING UNIT

    Thanks Compositepro for your detail explanation. And capliard thanks for u too. @ Compositepro! I got your point. Hoods are the best source of smoke extraction. But in this case we have an issue that thr is no enough space above the Ovens for Hood installation. Height from the top of the ovens...
  7. tcihvacff1

    VENTILATION SYSTEM FOR FOOD PROCESSING UNIT

    Hello Everybody! Good Day!!! With reference to the subject I am dealing with a retrofitting project for a food processing unit. wherein the food processing unit already has a ventilation system but failed or its inadequate. The floor has two portions, one is consists of big OVENS (2nos) from...
  8. tcihvacff1

    ASHRAE 62.1 2013 & ASHRAE 90.1 2013

    Ok dbill74. Thanks for your comment.
  9. tcihvacff1

    ASHRAE 62.1 2013 & ASHRAE 90.1 2013

    I will purchase it from ASHRAE website as u said. Thank u.
  10. tcihvacff1

    ASHRAE 62.1 2013 & ASHRAE 90.1 2013

    Sorry. I really didn't meant that.
  11. tcihvacff1

    ASHRAE 62.1 2013 & ASHRAE 90.1 2013

    Hi Everybody! I am looking for ASHRAE 62.1 & ASHRAE 90.1 2013 version handbooks. Anyone know the free download link? Or available with anyone please please share the copy. Your assistance is highly appreciated. Thanks one & all.
  12. tcihvacff1

    Return Plenum Box

    It's possible. But you need to take care of the following: 1. If the Surrounding rooms are unconditioned or if you have kitchen area nearby, then see that their must be a thermal barrier/partition in between the conditioned & unconditioned space above false ceiling. 2. Fresh air should be...
  13. tcihvacff1

    FLEXIBLE DUCT FOR PLENUM CONNECTION???

    dbill74 you are correct. I sent them a RFI but our consultant is damn good you know....After trying that I posted here. @317069 (Mechanical) I think its ok. but if I connect flex from the top then the balancing(round)damper will be in a vertical position which is again a issue. And also the...