Recent content by Useeeer

  1. Useeeer

    Can Torque applied be converted reliably into Anchor lock off load?

    Let me know if my understanding is correct. Assuming the anchor is prestressed by X by torque ( unknown here) and then by subjecting it to max pressures, we'll come to know net stress to reach yield strength fy. We know the actual yield strength of the rod. So fy-y should let us the prestress...
  2. Useeeer

    Can Torque applied be converted reliably into Anchor lock off load?

    Exactly! I guess they didn't tension it. From all the limited conversations I've been to they've tightened the bolt. That's it. They have the cell pressure from the system and are telling that the bolts were applied torque until the cell pressure has reached the maximum and started dropping...
  3. Useeeer

    Can Torque applied be converted reliably into Anchor lock off load?

    Thanks for sharing. I believe their statements are limited to certain conditions. Currently, we have asked the contractor to confirm the preload that's applicable for the ground anchor after accounting for all losses. I'm pretty much sure they are going to put it in bolt torque and clamping...
  4. Useeeer

    Can Torque applied be converted reliably into Anchor lock off load?

    Hello Everyone! For an anchored sheet pile wall (say 9m height), prestresses strands with a preload of 15T were recommended to limit deflection. Bridge abutment behind the sheet pile wall. However, during execution, contractor has replaced strands with micropiles (fy 500 to 600 MPa). We've...
  5. Useeeer

    Can Torque applied be converted reliably into Anchor lock off load?

    Hello Everyone! For an anchored sheet pile wall (say 9m height), prestresses strands with a preload of 15T were recommended to limit deflection. Bridge abutment behind the sheet pile wall. However, during execution, contractor has replaced strands with micropiles (fy 500 to 600 MPa). We've...
  6. Useeeer

    Pile cap extension of a Bridge Abutment

    We are currently working on a proposal. Following is the overall scope 1. The Pilecap (PC) supports the bearing from a bridge spanning across a navigation channel 2. The PC is supported on ground with continuous sheet pile at front for retaining the soil and fill behind and few rear piles 3...
  7. Useeeer

    AASHTO - Steel box section/ sheet piles

    Sorry for late response. Design methodology for LRFD is clear. Why I asked for any closed section example is.... The proposed sheet pile is subjected to substantial vertical load from bridge bearing as well. If you look at Eurocodes, we have clear limitation on thickness for a cross section and...
  8. Useeeer

    AASHTO - Steel box section/ sheet piles

    That is based on ASD. Isn't it? As per the latest edition, I couldn't find any provisions for ASD. They want to follow LRFD.
  9. Useeeer

    AASHTO - Steel box section/ sheet piles

    The above-mentioned figures indicate the force distribution and criteria for evaluating the embedment depth. Basically, geotechnical aspects, I believe. Section 11.8 indicates forces to be considered for structural checks. I'm looking at evaluating the structural capacity (utilization ratio)...
  10. Useeeer

    AASHTO - Steel box section/ sheet piles

    Hello everyone! Does anyone here have worked out example for design of flexural members with box section? I've prepared the design calculations based on the standard but couldn't get any solid examples for box sections. Lot of examples on I section are there. I need something to validate my...
  11. Useeeer

    Data related to old sheet piles (Larssen 4A type)

    Does anyone have dimensional details about Larssen 4A Piles?
  12. Useeeer

    HSS Baseplate connection resistances based on Eurocode

    Thank you HTURKAK for the reference. I'm still to work on it fully.
  13. Useeeer

    Alternate Material Grades

    Hi Everyone, Often, we design our structures with material grades corresponding to one grade pertaining to one standard and during construction, depending on availability, equivalent grade pertaining to other standards are selected. From EN standards to ASTM standards or vice versa. Mostly key...
  14. Useeeer

    Piles on slope ( weathered rock)in marine area

    Hi HTURKAK Actually, I posted this in another thread and got responses as well. Thought of linking but the thread seems deleted. Anyway, Thanks for your response. Batter pile construction is ruled out siting difficulties in positioning and driving. Rock anchor may be provided, depends on...