    Bar Bending Schedule

    How to prepare Bar Bending Schedule for One Way Slab
  2. Waseem Raja

    Hello. I'm getting ready to try an

    the most widely used general-purpose structural analysis and design software in civil engineering. In fact, these are the software that help you to fulfill your various designing goals. We have gone through the number of software and selected some of the best among them that will help you...
  3. Waseem Raja

    LVL column loads to basement slab vs adding footers

    How much load you can apply and the slab's concrete strength mostly depend on the soil underneath the slab. A light weight can be supported by a 4" slab, but not a heavy one. Additionally, the amount of the load plays a minor role. Understanding soil characteristics and concrete strength is...
  4. Waseem Raja

    Diference between BACKFILL and SELECTED FILL MATERIALS

    Any material removed during site excavation, without regard to precise specifications, would likely be used as general backfill; whatever you dug up, you put back. Select fill should be specified, either for the project or in a standard, as others have mentioned. Depending on the project...