Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations SDETERS on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by wth

  1. wth

    Radiant Heated Floor Slab

    I've faced similar objections, it's most likely due to the costs increase/inconvenience for the contractor.
  2. wth

    Strength Analysis Steel Metal grating Frame

    The factors in 1990 may vary in the various national annexes, probably not critical for OPs grating, but in Norway it's: 6.10 a: 1.35 x DL + 1.05/0.9 x LLs, or 6.10b: 1.35 x 0.89 + 1.5 x LL (main) + 1.05/0.9 x LL (other) for STR combinations.
  3. wth

    Minor calculations as a structural engineer

    I practice in Norway (buildings), and use a mix of hand calculations, excel, smath, "simple" software, python and FEA, depending on the task. And having worked for one of the largest companies it varies from team to team even within the companies how engineers solve their tasks. For your simple...
  4. wth

    Contractor will not provide rebar shop drawings?

    For regular buildings IFC should be sufficient for both manufacturing and placing of rebar. We model all the rebar in 3D in Revit, then we detail them in 2D and produce rebar schedules based on the 3D model, so all the info is in the model. As mentioned earlier there are bridges and state run...
  5. wth

    Contractor will not provide rebar shop drawings?

    Norway, it's worth mentioning we also have a pretty extensive national annex to Eurokode 0 covering quality control requirements for both design and construction for different complexities. We don't have any design and build firms, no contractors have in-house design departments, except maybe...
  6. wth

    Contractor will not provide rebar shop drawings?

    In our case it's simply not our job or responsibility to verify that they follow our drawings, the contractors are responsible for their delivery, and are subjected to mandatory 3rd party inspections for load bearing structures. It's not perfect, as the inspection mainly focuses on quality...
  7. wth

    Contractor will not provide rebar shop drawings?

    Interesting discussion for how rebar is handled in different parts of the world. Seems we're in our own category as we actually produce the shop drawings and rebar schedules as part of our design. Which is starting to feel more and more meaningless as we model it all in 3D anyway. We also don't...
  8. wth

    Stability Analysis for Walls/frames that support cathedral / vaulted / scissor trusses

    Fair point JAE, even detailing a couple of simple wood shear walls could blows our budget, a tall roof beam would in principle be more of the same.
  9. wth

    Stability Analysis for Walls/frames that support cathedral / vaulted / scissor trusses

    Don't do much wooden structures, but could you, in theory, utilize the roof as a semirigid slab to transfer this horizontal force to the gable walls and limit the deflection?
  10. wth

    PEMB Continuous Perimeter Footing Between Columns

    For a PEMB in my region you often get net uplift on foundations (single columns) for stability combinations, add the vertical component of a braced frame and you'll need ridiculously large single footings to resist uplift and gliding. By combining both columns in a frame you're "removing" the...
  11. wth

    Design Program Documentation

    Most of our work needs to be verified by a colleague pr. local regulations, so our criteria is that it must be enough documentation for a colleague to review it. I usually produce a simple report with importation inputs (loads, geometry, supports etc), key results for verifying the model and...
  12. wth

    Hollow slab from the 50s, references?

    The service loads increase for the current roof, I have to look through former building codes for other floors and compare it to new loads - but I don't expect an increase. The exterior walls are showing signs in limited areas of corrosion from what I've seen so far. My main concern is...
  13. wth

    Hollow slab from the 50s, references?

    I believe manpower were cheaper than materials at time of construction, so it might be constructed permanent void forms. Due to logistics concrete is still 150% at this location today, compared to central areas - can't imagine it was any better in 1950. Regardless of construction method, I...
  14. wth

    Hollow slab from the 50s, references?

    Thanks bones, that first image from 1912 looks very similar.
  15. wth

    Hollow slab from the 50s, references?

    It's a weird one, might be inaccurate on the architectural plans. Didn't take any photos, but I'm pretty sure there wasn't any visible gaps between panels. Could've be a done in 2 operations, but even then you'd have to leave plates under the top part.

Part and Inventory Search