Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. khan552

    Perform an Xray before PWHT

    Normally in case of hydrogen service, RT (Radiography) has to be done before and after PWHT. Please let me know service of your equipment?
  2. khan552

    Nozzle limiting Loads for API-650 Tanks with dia less than 36 meter

    I know that Nozzle limiting loads can be calculated as per API-650, Appendix-P. But Appendix-P is applicable for Tanks having diameter greater than 36 meters. Please let me know with API-650 reference, how to calculate Nozzle limiting loads for Tanks having diameter less than 36m. Thanks,
  3. khan552

    ASME Design and Welding Symbols

    Applicable standard is AWS A2.4 and for fillet weld it uses the leg dimension. Also on fabrication drawings leg size is given. But ASME code calculations are on throat size and from throat size, leg size can easily be calculated.

Part and Inventory Search