Hello everyone.
I am about to be involved in a project which involves specifying pumps for a refined product terminal center. These would be feed / discharge pumps for API tanks. Being new to this I've been doing research on this. Besides NPSH and power requirement calculation. What other basic...
I am not sure if this is the right forum to put this question but here it goes...
Would like to hear from everyone regarding what technologies or solutions are available for the purpose of detecting, measuring or mitigating Methane emissions, or for Carbon Capture.
Great comments everyone one!
Right now I am waiting until next week when they're supposed to notify me if I continue for an in-person interview with the hiring manager. The screen interview was mostly conversational with the HR rep. Lasted 15 min.
Really hope I hear back from them.
Hello everyone,
I recently been contacted by an E&P for a screen interview for the role of a Process Engineer at a Petrochemical Facility.
Can anyone suggest / reference a good book/website/etc. that I may look at and do an intense reading for a less than a week and help me grasp the general...
metengr,
That is correct, water will be used. Could you share on any guidelines to follow on how much of an area must be closed for the test depending on the pressure level?
Hello everyone,
I will be working in setting up a hydrostatic testing (following B31.3) area inside a spool fabrication building. Spool sizes will be up to NPS 8. As of now, I do not know what will be the maximum pressure. The highest I've seen have been D Pressure Class.
Well, I've been...