  1. MEP Designer

    electrical switchyard fire protection

    does NFPA recommend a yard hydrant for the outdoor switch yard located remote from the generation plant I appreciate Your cooperation..
  2. MEP Designer

    cilled water quality

    thanks mr. lilliput1, but my question is(what are the approved values of the water sample analyses and based on witch code)?? I appreciate Your cooperation..
  3. MEP Designer

    chilled water quality

    what is the conductivity value for the chilled water ac system??. and please provide me with the reference code and standard that determine the chilled water quality (PH, conductivity, etc.) I appreciate Your cooperation..
  4. MEP Designer

    cilled water quality

    what is the conductivity value for the chilled water ac system??. and please provide me with the reference code and standard that determine the chilled water quality (PH, conductivity, etc.) I appreciate Your cooperation..
  5. MEP Designer

    outdoor portable fire extinguishers installation

    thanks "cdafd", and shall be protected from the Sun rays or not?? I appreciate Your cooperation..
  6. MEP Designer

    outdoor portable fire extinguishers installation

    shall the outdoor portable fire extinguishers installed in cabinet or not? I appreciate Your cooperation..
  7. MEP Designer

    NFPA requirements for power plant building separation

    is it necessary to Install all buildings with 9.1 m separation between each other or by fire wall?? I appreciate Your cooperation..
  8. MEP Designer

    Coal Power Plant fire protection requirments

    dear all, kindly, can you help me to determine the requirements for Coal Power Plant fire protection I appreciate Your cooperation..
  9. MEP Designer

    NFPA requirements for power plant building separation

    what is the NFPA requirements for a gas power plant buildings separation (the minimum separation between the plant buildings and fire rated walls) I appreciate Your cooperation..
  10. MEP Designer

    Outdoor fire piping network material

    please can you help me to understand the code requirements I appreciate Your cooperation..
  11. MEP Designer

    Outdoor fire piping network material

    thermal power plant (combined cycle) I appreciate Your cooperation..
  12. MEP Designer

    Outdoor fire piping network material

    underground and aboveground for power plant firefighting system piping network connected to fire pump and supply the hydrants and building fire systems. I appreciate Your cooperation..
  13. MEP Designer

    Outdoor fire piping network material

    what is the Outdoor fire piping network material as per NFPA?> I appreciate Your cooperation..
  14. MEP Designer

    Outdoor fire piping network material

    what is the Outdoor fire piping network material as per NFPA?> I appreciate Your cooperation..
  15. MEP Designer

    Cable Trenches Fire Detection Requirments

    thanks a lot David I appreciate Your cooperation..
  16. MEP Designer

    Cable Trenches Fire Detection Requirments

    Thanks for the reply, we have a cable trenches under a switchgear room and equipped with trench separation, cable separations, cable and tray materials are according NFPA, fire stops along trench.my question is based on your experience, a linear heat detectors shall be provided also? or the...
  17. MEP Designer

    Power plant fire detection system

    is a fire detection system required for cable trenches for a 500 kV & 220 kV GIS substation in accordance with NFPA?? I appreciate Your cooperation..
  18. MEP Designer

    Cable Trenches Fire Detection Requirments

    I appreciate if any one can help.. I appreciate Your cooperation..
  19. MEP Designer

    Cable Trenches Fire Detection Requirments

    is a fire detection system required for cable trenches for a 500 kV & 220 kV GIS substation in accordance with NFPA??