Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Trig_Shah

    Static Equipment Installation

    Can anyone guide me to the standards that I can refer for Installing the Static Equipments on the Petrochemical site ? I have the API 686 for the rotating equipment but could not find anything for static ? Please advise
  2. Trig_Shah

    ASME Sect 8 Vessel

    Thank You [bigsmile]
  3. Trig_Shah

    ASME Sect 8 Vessel

    Does ASME Sect 8 Tell you to have a smooth Ground flush finish on the inside Weld of the Nozzle for a pressure Vessel? or is it something that I need to specifically tell my vendor, if I require it ?. If ASME tells you, can I please have the Section number. Thank You
  4. Trig_Shah

    PWHT vs PHT

    Thank You.
  5. Trig_Shah

    PWHT vs PHT

    I am new to Vessel Industry and would like to know the differance between PHT and PWHT. I have a vessel that has PHT stamped on it and I wanted to know does it mean the entire vessel is Post Weld Heat Treated or just the portions of the vessel (like Nozzle...) is Heat Treated.

Part and Inventory Search