  1. CEJM

    heat treat facility

    STOOKEYFPE, THANK YOU FOR YOUR RESPONSE, I WILL HAVE THE ELECTRICAL CONTRACTOR INSTALL HEAT TRACE. I WILL CONTACT TYCO AGAIN AN GO OVER THE INSTALLATION, CONTROLLERS, MAINTENANCE SCHEDULE REQUIRED.
  2. CEJM

    heat treat facility

    I called tyco and explained to them as how I plan on using this heat tape. they assured me that for my application it would be allowed. I am going to submit copy to our local fire prevention bureau for review. to make sure they will allow this product to be used.
  3. CEJM

    heat treat facility

    i am running bulk main dropping a tee off at each dog house, the dog houses will be heated.
  4. CEJM

    heat treat facility

    according to the info it is nfpa and ul approved
  5. CEJM

    heat treat facility

    matthew, please expand on your comment
  6. CEJM

    heat treat facility

    working on project existing heat treat facility, existing oil quenching protected by co2 system. the remainder of plant has 9 furnaces. my question is my design of .30.3250 with 500 outside hose. entire facility will be dry systems. there may be some areas that could be reduced such as...
  7. CEJM

    Grow op design - racked product

    I AM CURRENTLY IN THE BID/DESIGN STAGE OF A MJ FACILITY, CEILING HEIGHT IS ONLY 14FT, THEY STATED THAT THERE PRODUCT WOULD BE 3FT BELOW CEILING HEIGHT. I BASING MY QUOTE ON OH2 THROUGH OUT THE ENTIRE PROJECT. THERE WILL BE NO "EXTRACTION" AT THIS LOCATION. BASED ON YOUR STORAGE HEIGHT I WOULD...
  8. CEJM

    nfpa small arms fire protection requirements

    THANK YOU FOR YOUR RESPONSE, HERE IS WHAT I CAME UP WITH, CLASS IV, BLD HEIGHT MAX 20FT, IF THE BLD HAD BEEN LESS THAN 16 I COULD HAVE GONE WITH OH2, BUT BEING MAX 20 I WENT WITH EH2, PALLETIZED STORAGE HEIGHT 5 TO MAX OF 10FT. READING NFPA495 IT SEEMS THERE MORE CONCERENED WITH THE PLACSTIC...
  9. CEJM

    nfpa small arms fire protection requirements

    i have a project that owner will be storing ammunition on pallets on the floor there looking to store 60,000 to 80,000 pounds of ammo. I have read thru nfpa 495 but do not see any mention of density would oh group 2 be statisfactory?