working on project existing heat treat facility, existing oil quenching protected by co2 system. the remainder of plant has 9 furnaces.
my question is my design of .30.3250 with 500 outside hose. entire facility will be dry systems. there may be some areas that could be reduced such as maintenance shop and shipping.
i would like to install fire pump and run a 8in bulk main thru the plant, drop off tees for dry pipe valves. the problem i have is there is no approved heat trace.
all imput would be will be appreciated
my question is my design of .30.3250 with 500 outside hose. entire facility will be dry systems. there may be some areas that could be reduced such as maintenance shop and shipping.