Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  1. Pgee630

    BS 7430 resistance to earth

    Hi, May I seek some advice regarding BS 7430 requirement on resistance to earth. I see in Annex A regarding legislation (the Electricity Supply Regulations), it states resistance to earth has to < 1 ohm. I think it's referring to TN-S system. But how about TT system? And how about the HV (or...
  2. Pgee630

    Diesel generator fuel pipe and chimney sizing

    @catserveng, Thanks a lot for the information provided, much appreciated your help. Just also wondering if there is a separate section called "Piping system basic information" available, as it is being referred in the "Diesel fuel and Diesel fuel systems" section. Many thanks P
  3. Pgee630

    Diesel generator fuel pipe and chimney sizing

    Thanks TugboatEng. I understand the general principle to size any pipes or ducts for fluid or air. But I'm wondering if there is any chart or table that is available for diesel fuel and generator exhaust hot gas so that I can use to check the fuel pipe size and the chimney size, same as that we...
  4. Pgee630

    Diesel generator fuel pipe and chimney sizing

    Hi, Could anyone please advise me any formula or chart / table for sizing of fuel pipe and the exhaust chimney of a diesel generator? The chimney needs to run vertically to tens of meters above the generator location within a building. Thanks PMCH
  5. Pgee630

    Rule of Thumb for Sizing Breaker for Future Capacitor Bank and Active Harmonic Filter

    Hi Che, The installation is based on IEC, a LV system, there is low power factor penalty imposed by utility company. Thanks.
  6. Pgee630

    Rule of Thumb for Sizing Breaker for Future Capacitor Bank and Active Harmonic Filter

    HI, May I know if there is any rule of thumb to reserve the breaker provision for future capacitor bank and active harmonic filter in an electrical system - i.e. sizing the breaker for the future cap bank and AHF. The reason is that at the moment of design, we don't have any information about...
  7. Pgee630

    Humidity Control for Tape Storage

    @nuuvox000 the humidity range I described must be maintained. I'm just wondering if the chilled water coil can already do the job without a dehumidifier. Though the load is basically near to 100% of sensible load, we may still have a bit of latent load due to infiltration, or if there are...
  8. Pgee630

    Air Flooding System

    @nuuvox000 Basically I'd like to understand how to determine the pressure drop of the air path if a flooding system is used, e.g. a pressurized raised floor system with the AHU just immediately connected to it with air outlets at various locations. I see such kind of raised floor design...
  9. Pgee630

    Humidity Control for Tape Storage

    @MintJulep Thanks for your response. May I understand a bit more on the theory behind?
  10. Pgee630

    Air Flooding System

    Hi, May I have some advices on air flooding system. Assume I have to design an air flooding system, e.g. a pressurized raised floor, how to estimate the air pressure drop of this flooding system in order to size the external static pressure of the AHU ? Thanks.
  11. Pgee630

    Humidity Control for Tape Storage

    Hi, I've a case where it requires an indoor air conditioned environment be maintained at 16 to 25 degC and 20% to 50% RH, for tape storage equipment. Assume the load basically is sensible load (tape storage equipment only). If just using a normal chilled water system, e.g. 7 degC supply and 12...
  12. Pgee630

    Transfer of STS at Phase Angles Difference

    The two sources ultimately coming from the same utility feeder, so suppose won't have major difference between their phase angles if they are in the same phase, e.g. L1, right? However, if the inputs are from L1 and L2, then the difference might not be expected to be minor right? Given we don't...
  13. Pgee630

    Transfer of STS at Phase Angles Difference

    @waross Transfer time is just few milliseconds with synchronous inputs.
  14. Pgee630

    Transfer of STS at Phase Angles Difference

    @waross It's a single phase 30A 220V STS supplying critical load IT load, that's why a reliable transfer is a must.
  15. Pgee630

    Transfer of STS at Phase Angles Difference

    Hi, Would like to seek some advices on STS. The design consultant designs with the source 1 and source 2 input to a single phase STS in different phases (e.g. S1 on L1 and S2 on L2, S1 and S2 originate from different power transformer). Assume this is incorrect / bad practice as normally S1 and...
  16. Pgee630

    Breakers Discrimination

    Hi, Is different brand of breakers not suggested to be mix-used in power distribution to avoid discrimination issues? Thank you.
  17. Pgee630

    Reverse kVar protection of genset

    Thanks all for the valuable advices!
  18. Pgee630

    Reverse kVar protection of genset

    @ thermionic1 We have 2 cases: 1. single genset not connecting to grid any time. 2. multiple parallel gensets, also not connecting to grid any time. Thanks
  19. Pgee630

    Reverse kVar protection of genset

    Hi, May I seek some advices about the reverse kVar protection: is diesel genset normally equipped with reverse kVar protection?
Back
Top