Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Duck50

    Pneumatic Proof testing

    If you have a 1/4" SS line it is probably seamless tubing with compression tube fittings which means that a hydrotest is useless sense hydro's are for testing weld integrity only. With a harmless fluid like helium a simple leak test at service pressure ought to be adequte. GTD
  2. Duck50

    Why is it important to remain around 5 ft/s flow?

    Well, I have seen every possible response to the old 5 fps rule, except for the one that I learned. I did the piping design for a hotel and the architect told us to keep the velocity to 5 fps because one cannot hear the sound of the water rushing through the lines, which, if you think about it...
Back
Top