Dear Friends,
I am having Cement wastage more at my Project in Batching Plant Concrete. I Cheked Calibration and Dial Gauge movement in batching Plant, Everything is good. But when i am taking Yield from Batching Plant i found 7% of Required Output is less. What are the possibilities to avoid...
dear again irulandi
now the cracks is enlarging , specifically its come staircase waist slab and near stair cases area.
i checked block the compressive strength test also passed.
now what i do .
please throw some light on this
Dear Friends ,
i am constracting one town plaza structure in hill station at mumbai. It is Double storied structure one floor is concrete top floor is truss & sheeting. Column is steel column from foundation.
For this project my sand blasting in structurl steel activity start in Heavy Monsoon...
i am constructing one hospital project at mumbai. In Masonary works we have used solid blocks, yesterdat i found in one wall is cracked in 5m lenght and width is 5to6mm.
That wall construction was over by before two months ( inculding plastering ) now POP applying activity in progress.
I found...
i have constructing one hospital 11 storied building at mumbai.
i am facing cracks problems at concrete
in every pouring after five hours the concrete surface is showing cracks ( specifically in slabs )
Width of cracks maximum 6MM
Depth of cracks 20 to 30MM
The thickness of RCC slab is 150MM...