Amines should be put into the feedwater line , or feedwater (condensate preheater)tank prior to boiler injection. An excellent amine is morpholine. It has a 13pH so PPE is definitely needed when handling. The amine being injected at the feedwater will protect the boiler, components and piping...
Thanks Mike, I will check that source also. The problem I am encountering is such. After checking various vendor charts, I see discrepancies in the flange bolt circles, "mm" identification/conversion, pipe OD/ID, etc. between them. I am also being told that the only difference between our NPT...
I am currently involved in a project wherein US made components such as Pipe thread and ANSI flanges will need to be mated up to the Metric(DN) standard pipe and flanges in Europe (specifically Spain). I am looking for information which will let me steer contractors to the right parts...